Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84063 REL 6: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
84063 REL 6
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Contract Continuation:
Previous: Next:
76913 REL 37: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
  • CR-369800: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Contract Status:
Issued
Contract Description:
The Lower Clearwater and Potlatch Watersheds Habitat Improvement project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River. The Potlatch River is critical to wild Snake River steelhead. This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan - 2019 Amendment (Potlatch Plan). The Potlatch Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Tier 1 priority tributaries for restoration work include: East Fork Potlatch River, Big Bear Creek (including Little Bear Creek), and Corral Creek. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load, increasing base flows, and reducing high spring run conditions. Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, reservoir flow augmentation, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

This contract covers 2023-2024 actions by the Idaho Department of Fish and Game (IDFG) and Latah Soil and Water Conservation District (Latah SWCD) for the Lower Clearwater and Potlatch Watersheds Habitat Improvement project.  

IDFG actions in this contract include implementing the Cooley Habitat Improvement Project; developing engineering designs for the Cooley #2 project; Spring Valley Reservoir Flow Augmentation Development survey and design; general habitat repair and maintenance; developing a four-part video series for education and outreach; and the identification and selection of new work for future implementation.  

Latah SWCD actions in this contract include continued planting at sites including Corral Creek/Upper Tee Meadow Restoration project site, East Fork/Fry Creek, West Meadow Corral Creek, and others; engineering design development for culvert replacement; monitoring at the USGS gaging station at the mouth of the Potlatch River; maintenance of restoration structures at various locations; and development of adaptive management and maintenance plans for past Latah SWCD project sites.  
Account Type(s):
Expense
Contract Start Date:
07/01/2023
Contract End Date:
06/30/2024
Current Contract Value:
$1,027,357
Expenditures:
$556,789

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Daniel Affonso Bonneville Power Administration Yes Contracting Officer dxaffonso@bpa.gov (503) 230-3893
Ryan Banks Idaho Governor's Office of Species Conservation Yes Contract Manager ryan.banks@osc.idaho.gov (208) 791-3014
Matt Belnap Idaho Department of Fish and Game (IDFG) Yes Technical Contact matt.belnap@idfg.idaho.gov (208) 569-1283
Gary Byrne Idaho Department of Fish and Game (IDFG) Yes Interested Party gary.byrne@idfg.idaho.gov (208) 287-2778
Mike Edmondson Idaho Governor's Office of Species Conservation Yes Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) Yes Technical Contact berhardt@latahswcd.org (208) 874-3821
Graham Freeman Idaho Governor's Office of Species Conservation Yes Supervisor graham.freeman@osc.idaho.gov (208) 332-1555
Robert Hand Idaho Department of Fish and Game (IDFG) Yes Technical Contact robert.hand@idfg.idaho.gov (208) 750-4209
Andy Hill Latah Soil and Water Conservation District (SWCD) Yes Technical Contact ahill@latahswcd.org (208) 315-0907
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
David Kaplowe Bonneville Power Administration Yes Supervisor djkaplowe@bpa.gov (503) 230-5365
Eric Leitzinger Bonneville Power Administration Yes F&W Approver ejleitzinger@bpa.gov (503) 230-3534
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Jacquelyn Schei Bonneville Power Administration Yes Env. Compliance Lead jlschei@bpa.gov (503) 230-5893
Matthew Schwartz Bonneville Power Administration Yes COR mdschwartz@bpa.gov (503) 230-4225
Carolyn Sharp Bonneville Power Administration Yes Interested Party casharp@bpa.gov (503) 230-5206
Ken Stinson Latah Soil and Water Conservation District (SWCD) Yes Technical Contact kstinson@latahswcd.org (509) 338-2549
George Zamora Latah Soil and Water Conservation District (SWCD) Yes Technical Contact gzamora@latahswcd.org (208) 874-7982


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance and Consultation Review A: 165. Environmental Compliance and Consultation Review 06/30/2024
Effective implementation management and timely contract administration B: 119. IDFG: Project management and administration 06/30/2024
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish C: 114. IDFG: Lower Clearwater/Potlatch Project Identification 06/30/2024
Final design complete. D: 175. IDFG: Cooley #2 WFLBC - design 06/30/2024
Produce feasibility document with strategies to increase dam height at Spring Valley Reservoir. E: 174. IDFG: Spring Valley Reservoir Flow Augmentation Development 06/30/2024 07/17/2023
Complete restoration on Cooley property on WF Little Bear. F: 29. IDFG: Cooley WFLBC - large wood enhancement project implementation 06/30/2024
Distribute four-part video outreach series. G: 99. IDFG: Outreach and Education 12/22/2023 12/25/2023
Unscheduled maintenance/repairs completed as needed H: 186. IDFG: Unscheduled maintenance & repair 06/30/2024
Completed Annual Report I: 132. IDFG: Annual report for Contract 76913 REL 37 (July 1, 2022-June 30, 2023). 03/31/2024 03/27/2024
Effective implementation management and timely contract administration J: 119. Latah SWCD: Manage and Administer BPA Contracts 06/30/2024
Develop and Update Stewardship Plans K: 174. Latah SWCD: Develop Stewardship Management Plans for Past Latah SWCD/BPA Project Sites 06/30/2024
Operate and maintain all contractual habitat improvement structures L: 186. Latah SWCD: Maintain Restoration Structures - Corral Creek/Upper Tee 06/30/2024
Implement FY22 Stewardship Plan M: 186. Latah SWCD: Implement FY22 Stewardship Plan - Upper Corral Creek/Vassar Meadow 06/30/2024
Implement FY22 Stewardship Plan N: 186. Latah SWCD: Implement FY22 Stewardship Plan - Upper Corral Creek/Five-Acre Meadow 06/30/2024
Implement FY22 Stewardship Plan O: 186. Latah SWCD: Implement FY22 Stewardship Plan - Corral Creek/Tee-Colby Meadow 06/30/2024
Implement FY22 Stewardship Plan P: 186. Latah SWCD: Implement FY22 Stewardship Plan - Corral Creek/Racetrack Meadow Restoration 06/30/2024
Implement FY22 Stewardship Plan Q: 186. Latah SWCD: Implement FY22 Stewardship Plan - Little Bear Creek/Nora Creek 06/30/2024
Implement FY22 Stewardship Plan R: 186. Latah SWCD: Implement FY22 Stewardship Plan - East Fork Potlatch River/Two-mile Meadow 06/30/2024
Complete native plantings for fall 2023 and spring 2024 S: 198. Latah SWCD: Plant Vegetation on Corral Creek- West Meadow Extension restoration project site 06/30/2024
Complete native plantings for fall 2023 and spring 2024 T: 198. Latah SWCD: Plant and Maintain Vegetation on Fry Creek Restoration Project Site 06/30/2024
Maintain field operations infrastructure and collect and process native seed for restoration projects. U: 198. Latah SWCD: Field Crew Coordination, Maintenance of Facilities and Equipment and Collection of Native Seed 06/30/2024
Produce vegetation plan V: 174. Latah SWCD - East Fork Potlatch River/Vegetation Restoration 06/30/2024
Final design complete W: 175. Latah SWCD - Culvert A/Felton Creek 06/30/2024
Final design complete X: 175. Latah SWCD - Culvert B/Big Meadow Creek 06/30/2024
Produce accessible, error-checked datasets Y: 157. Latah SWCD: Maintain USGS Potlatch River Stream Gage 06/30/2024
Completed Annual Report Z: 132. Latah SWCD: Submit Progress Report for the period July 2022 - June 2023 03/31/2024 02/20/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 198 Maintain Vegetation
  • 8 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 174 Produce Plan
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance and Consultation Review
B 119 IDFG: Project management and administration
C 114 IDFG: Lower Clearwater/Potlatch Project Identification
D 175 IDFG: Cooley #2 WFLBC - design 05/26/2023
E 174 IDFG: Spring Valley Reservoir Flow Augmentation Development 05/26/2023
F 29 IDFG: Cooley WFLBC - large wood enhancement project implementation 05/26/2023
G 99 IDFG: Outreach and Education
H 186 IDFG: Unscheduled maintenance & repair
I 132 IDFG: Annual report for Contract 76913 REL 37 (July 1, 2022-June 30, 2023).
J 119 Latah SWCD: Manage and Administer BPA Contracts
K 174 Latah SWCD: Develop Stewardship Management Plans for Past Latah SWCD/BPA Project Sites 05/26/2023
L 186 Latah SWCD: Maintain Restoration Structures - Corral Creek/Upper Tee
M 186 Latah SWCD: Implement FY22 Stewardship Plan - Upper Corral Creek/Vassar Meadow
N 186 Latah SWCD: Implement FY22 Stewardship Plan - Upper Corral Creek/Five-Acre Meadow
O 186 Latah SWCD: Implement FY22 Stewardship Plan - Corral Creek/Tee-Colby Meadow
P 186 Latah SWCD: Implement FY22 Stewardship Plan - Corral Creek/Racetrack Meadow Restoration
Q 186 Latah SWCD: Implement FY22 Stewardship Plan - Little Bear Creek/Nora Creek
R 186 Latah SWCD: Implement FY22 Stewardship Plan - East Fork Potlatch River/Two-mile Meadow
S 198 Latah SWCD: Plant Vegetation on Corral Creek- West Meadow Extension restoration project site 03/27/2024
T 198 Latah SWCD: Plant and Maintain Vegetation on Fry Creek Restoration Project Site 04/08/2024
U 198 Latah SWCD: Field Crew Coordination, Maintenance of Facilities and Equipment and Collection of Native Seed 06/02/2023
V 174 Latah SWCD - East Fork Potlatch River/Vegetation Restoration 05/26/2023
W 175 Latah SWCD - Culvert A/Felton Creek 05/26/2023
X 175 Latah SWCD - Culvert B/Big Meadow Creek 05/26/2023
Y 157 Latah SWCD: Maintain USGS Potlatch River Stream Gage 05/26/2023
Z 132 Latah SWCD: Submit Progress Report for the period July 2022 - June 2023
AA 185 Periodic Status Reports for BPA